The Greenwood Yard (also known as the Greenwood Complex) is a rail yard with support buildings that service subway vehicles on Line 2 Bloor–Danforth of the Toronto subway.
Greenwood is one of two subway yards on Line 2, the other being the much smaller Keele Yard.
The yard contains 5 buildings, two of which are the General Overhaul and Repair Shop (a.k.a. Greenwood Shop) with a floor space of , and the carhouse for inspection, minor repairs and washing. The Greenwood Shop has specialized shops for heavy overhauls of subway cars and components as well as stores. The Greenwood Shop is operationally separate from the carhouse servicing the Bloor–Danforth subway fleet.
When it opened, the yard had a storage capacity for 244 subway cars. The yard currently has a 328-car storage capacity.
The Greenwood Yard is connected to the Bloor–Danforth line by a multi-level wye between Donlands station and Greenwood stations; the wye allows both east- and westbound mainline trains access to the yard. The arrangement allows for trains to be added into or taken out of service with minimum disruption to ongoing operations.
Greenwood Yard provides storage, inspection and running maintenance for the Line 2 revenue fleet, and contains major overhaul and repair shops for the entire subway fleet. Greenwood Yard is also a centre for the servicing and operation of workcars used by the Track and Structure Department to repair and maintain the entire subway system.
The Greenwood Yard also performed heavy maintenance on the S series ICTS cars from Line 3 Scarborough that could not be completed at the McCowan Yard. As the Track gauge and technology differed between lines 2 and 3, ICTS cars had to be transported by truck to Greenwood for major maintenance work.
Greenwood Yard, like other active Toronto Transit Commission yards, operates 24 hours per day, 7 days per week. Yard activity is minimal during the peak service periods when many trains are in revenue service. The yard is particularly busy in the evening and early morning hours to service and maintain the subway fleet after which the trains are put into position to go into service in the morning.
In May 1965, the Greenwood Yard was put into partial service for some repair work. Heavy maintenance of subway bogies was transferred from the Hillcrest Complex to Greenwood.
On February 26, 1966, the yard went into full service with the opening of Line 2 Bloor–Danforth.Toronto's new transit shops step up tempo Railway Age December 6, 1965 pages 31-33
When it opened, the yard had a railway siding and some four Rail profile, dual gauge ( and ) track for the delivery of subway cars from the manufacturer. However, circa 2013, the TTC removed the standard gauge track to make more room for subway car storage. As of 2016, the standard gauge siding had been severed from both the yard and the railway mainline. Closeup of the former standard gauge siding between the yard and the railway mainline.
Current operations
History
Future
External links
|
|